Previous Next
Sold on
9/17/19
# of Bids
518
ITEM DETAILS
These pipes originally went missing in transit and replacements were therefore sent. The original pipes were received in good condition but are surplus to requirement.

 

Inspection Report


Summary
  • Type: Stainless Steel Pipes
  • Total Number of Pipes: Approx 87
  • Total Volume: 290,270 cbm
  • No. of Packages: 66 Skids
  • Total Gross Weight: 84,640.00
  • Total Net Weight: 81,462.00
  • Customs Status: Customs Cleared

  • Items are stored as seen in the attached photos. The location can provide personnel and loading equipment. There will be a charge of $5800 to load to the pipes for the buyer. This must be settled directly with the location prior to loading.



    ADDITIONAL LOT TERMS
    SalvageSale - The goods, unless stated otherwise, should be viewed as salvage and therefore have a likelihood of being damaged or substandard and may not be fit for purpose, please refer to the description above for more details. No warranties are expressed or implied. Please ensure that you read and agree to the specific SalvageSale Terms and conditions that can be found by clicking on the “Terms & Conditions” link at the bottom of this page.
    Description Rating Details  
    Conditions After the lot closes, the Seller will decide either to accept or reject the high bid. If the Seller accepts, an invoice will be issued and the lot will transact. If the Seller rejects, the Buyer will be notified and there will be no sale. A Seller award decision is expected within 2 business days of the close date.
    Removal (i) This Item is being sold AS IS WHERE IS. NO customs, export, or import assistance is available from our Company, the Seller, or the Storage Location. Our Company, Seller, and Storage Location expressly disclaim the appropriateness of this item to be exported from, or imported to, any country. Shipping, logistics, transportation, loading, customs, export, and import activities, and all associated costs, are the sole responsibility of the Winning Buyer.
    Removal (ii) Buyers are required to examine all items prior to removing from the location. If the items differs significantly from how it was represented in the lot description, the Buyer must contact Customer Care before removing.
    Removal (iii) Removal Deadline: 8 days after the invoice is generated. Unclaimed items beyond the removal deadline are subject to additional fees and forfeiture unless the winning buyer makes specific arrangements with the storage location.
    Extended Bidding In the event that a bid is placed in the last 3 minutes of the auction close time, then the auction will be subject to 3 minutes extended bidding until there are no bids for a full 3 minutes.